Xinzheng city Shaodian Road Overpass Project was successfully completed and put into use!

  Xinzheng city Shaodian Road Overpass Project, as one of the livelihood realities in xinzheng city, started construction in May 2022, and was successfully completed and delivered on July 31, 2023 with the strong cooperation of various departments.

  The project consists of three single-span overpasses, which are generally C-shaped in plane, and adopt U-shaped steel box girder structure, respectively spanning Hongyuan Road and Shaodian Road. The main span is 49-55 meters, and the bridge width is 5 meters. The main bridge and stairway are designed with ceilings, which integrates landscape effect and weatherproof function, and is equipped with distribution box, lighting and LED display screen.

  In order to reduce the impact of construction on citizens' travel, during the construction process, special personnel were assigned to manage and quantify the construction tasks, and measures for air pollution prevention and control and epidemic prevention and control were strictly implemented. The construction and supervision personnel stuck to the construction site, worked overtime day and night, implemented in sections, rushed the construction period, rushed the progress, ensured the quality, closely followed the time node, and advanced as planned, and completed the construction tasks as scheduled.

  The construction of this project will ensure smooth traffic and pedestrian safety, realize the complete separation of pedestrians and students from motor vehicles, improve the traffic environment, enhance the road image, and further facilitate the travel of citizens and students.

  (Source: xinzheng city Municipal People's Government website)